ROYAL TARMAC BREAK-OUT
With somewhere as prestigious as Windsor Castle, the roads in, out and around the estate have to be spotless and very well maintained. Which is why Atlas Bulk Carriers got a call to help with the tarmac break-out.
THE PROJECT
The main part of the project for us was the tarmac break-out but because of the venue, we also had to be able to supply drivers who had security clearance. Driver clearance is a robust process which involves thorough background checks, and we are proud to have eight security cleared drivers. All of our grab drivers are also specially trained and ALLMI certificated and will be as helpful as possible.
OUR ROLE
Our eight-wheel grab lorries are perfect for this type of job, with the capacity to carry up to 16.5 tonnes or approximately 12 cubic metres, the driver can load a lorry in between 15 and 30 minutes. Using the crane and bucket mechanism, the lorries can grab materials from the side of the vehicle. This in turn makes it very quick and convenient for clients who can place their material in one spot ready to be taken away.
Contact us on 01932 569 222 to discuss your requirements and specifications.